Environment

Metro station "Technopark"

Table of contents:

Metro station "Technopark"
Metro station "Technopark"

Video: Moscow, overground metro station "Technopark" 2024, July

Video: Moscow, overground metro station "Technopark" 2024, July
Anonim

Metro Technopark opened not so long ago - in 2015. This station is located between Avtozavodskaya and Kolomenskaya. The article describes the architectural features of the Technopark metro, as well as infrastructure facilities located in its vicinity.

Image

Construction

At the beginning of the two thousandths, there was a need for the construction of a new station in the area of ​​the Nagatinsky floodplain park. On the territory of the former ZIL plant, the Nagatino i-Land technopark was built, including a residential complex, a business center, a hotel, and several shopping and entertainment organizations.

Information on the construction of a new station of the Zamoskvoretskaya line appeared for the first time in the press in 2006. But the opening date has long been unknown. Moreover, for a number of reasons, the start of the construction of the Technopark metro station was postponed several times to a later date.

Exploration work was carried out in 2012. The opening of the Technopark metro station was originally planned for 2018, but took place earlier - at the end of December 2015.

Architectural features

"Technopark" is an open type metro station. Passengers move from one platform to another through the upper floor of the lobby. The station is equipped with an elevator. The walls are finished with polymer coatings and siding. Unlike most of the new Moscow metro stations, Technopark has a pavilion in a rather restrained style. Especially in comparison with the interior of "Salaryevo" or "Rumyantsevo".

Image

Nagatinsky metro bridge

A scenic view of the Moscow River opens to passengers when they pass this metro station. Driving from Kolomenskaya to Technopark passes along the Nagatinsky metro bridge. It was built in the late sixties according to the design of K. N. Yakovlev and A. B. Druganova. Then the construction of a new bridge solved many problems. Locals had to use the Danilovsky bridge before, which was rather inconvenient.

Nagatino I-Land

This major urban development project has been implemented with government support. The territory on which the Nagatino-ZIL complex was built has long been an industrial zone. Before the start of construction, a study of the soil was carried out, and then the removal of soil that was impregnated with harmful substances. In 2015, many shops and offices were opened on the territory of Nagatino I-Land, and therefore the launch of the Technopark metro station, which was planned to be completed in 2012, was postponed.

The total area of ​​the business park is 32 hectares. From here, you can walk to the Kolomenskaya metro station in just a few minutes. It is also worth saying that Nagatino-ZIL is located just eight kilometers from the Kremlin. Below is more detailed information about the facilities located on the territory of Nagatino I-Land.

Infrastructure

On the territory of Nagatino-ZIL there are three office centers named after the great scientists: Lomonosov, Descartes, Newton, Lobachevsky. They have a different structure. For example, Newton is a three-story building with an area of ​​less than three hundred square meters. The largest is the office center "Lobachevsky".

There are only a few catering facilities in the business park. Among them: "Orange", "Lunchhall." But the center is developing rapidly. In the future, according to the creators of the project, the office complex will provide jobs for about four hundred people. And this, in turn, will lead to the need for more cafes and restaurants.

Several stores were opened near the Technopark metro station: Tarket, Belaya gvardiya, Sinko. There is a branch of Sberbank and several real estate agencies.

Image